CM Punjab Free Solar Panel Scheme 2025 – Full Guide

The CM Punjab Free Solar Panel Scheme 2025, led by Chief Minister Maryam Nawaz Sharif, is designed to provide free solar energy systems to low‑income households in Punjab. The initiative targets households with electricity consumption of up to 200 units per month, aiming to reduce electricity costs and promote renewable energy use.

Read Also: Health Card Scheme Expands Insurance Integration Revealed

Eligibility Criteria

To qualify for the scheme (Phase 1), applicants must meet the following:

  • Be a Punjab resident with a valid CNIC.
  • Monthly electricity consumption up to 200 units (based on June 2024 billing).
  • Sanctioned load of up to 2 kW.
  • Only one electricity meter per household.
  • Not defaulters (no more than 3 late payments in 12 months).
  • Not involved in electricity theft or having defective meters.

Application & Balloting Process

Applicants could register through:

  • Online via the official portal: (enter CNIC & bill reference).
  • SMS, by sending your bill reference number and CNIC to 8800.
  • Following registration, a digital balloting occurred in March 2025 (around March 5–8) to select beneficiaries. The results were then published on the official portal.

How to Check Balloting Results

To view your status:

  1. Visit the results portal: cmsolarscheme.punjab.gov.pk/application-result.
  2. Enter your bill reference number (or CNIC where specified).
  3. Complete the CAPTCHA and hit Submit.
  4. You will see one of the following statuses:
    • Selected – your application is successful.
    • Waitlisted – you may be considered later.
    • Not Eligible – did not meet criteria.

Installation Timeline at a Glance

PhaseBalloting DateNumber of SystemsSystem TypesInstallation Window
Phase 1March 202594,4830.55 kW & 1.1 kWMarch to July 2025
Phase 2July 202550,0000.55 kW & 1.1 kWAugust to December 2025

Types of Solar Systems Distributed

CategoryMonthly Usage LimitSystem CapacityIncludes
Basic SystemUp to 100 units0.55 kWPanel, Inverter, Wiring
Extended System101–200 units1.1 kWPanel, Inverter, Wiring, Battery

Step-by-Step Next Process:

StepDescription
✅ Document VerificationOfficials will contact you for CNIC, electricity bill, and site verification.
🛠 Installation VisitTechnical team will assess your home for installation readiness.
🔌 System InstallationThe solar system will be installed within 30–90 days.
🧾 Ownership ConfirmationYou will sign ownership documents, and the system will be linked to your CNIC.

Benefits of the Scheme

  • 💰 Reduced Electricity Bills
  • 🔋 Uninterrupted Power for Basic Needs
  • 🌱 Environment-Friendly Energy
  • 🏠 Improved Quality of Life in Rural Areas

Final Words

The CM Punjab Solar Panel Scheme is a revolutionary step toward energy self-sufficiency in Punjab. If you’ve been selected, congratulations! You’re part of a growing movement toward clean energy. If not, don’t lose hope — more chances are coming soon.

📌 Frequently Asked Questions (FAQs)

What is the CM Punjab Solar Panel Scheme 2025?

The CM Punjab Solar Panel Scheme 2025 is a government initiative that provides free solar systems to low-income households in Punjab that consume less than 200 electricity units per month, to reduce electricity bills and promote clean energy.

How long does installation take after selection?

Installation usually takes 30 to 90 days after successful verification and site inspection.

Is there any fee or cost involved?

No, the scheme is 100% free of cost for selected households. Be cautious of any individual or agent asking for money.

Leave a Comment