The CM Punjab Free Solar Panel Scheme 2025, led by Chief Minister Maryam Nawaz Sharif, is designed to provide free solar energy systems to low‑income households in Punjab. The initiative targets households with electricity consumption of up to 200 units per month, aiming to reduce electricity costs and promote renewable energy use.
Read Also: Health Card Scheme Expands Insurance Integration Revealed
Eligibility Criteria
To qualify for the scheme (Phase 1), applicants must meet the following:
- Be a Punjab resident with a valid CNIC.
- Monthly electricity consumption up to 200 units (based on June 2024 billing).
- Sanctioned load of up to 2 kW.
- Only one electricity meter per household.
- Not defaulters (no more than 3 late payments in 12 months).
- Not involved in electricity theft or having defective meters.
Application & Balloting Process
Applicants could register through:
- Online via the official portal: (enter CNIC & bill reference).
- SMS, by sending your bill reference number and CNIC to 8800.
- Following registration, a digital balloting occurred in March 2025 (around March 5–8) to select beneficiaries. The results were then published on the official portal.
How to Check Balloting Results
To view your status:
- Visit the results portal:
cmsolarscheme.punjab.gov.pk/application-result
. - Enter your bill reference number (or CNIC where specified).
- Complete the CAPTCHA and hit Submit.
- You will see one of the following statuses:
Installation Timeline at a Glance
Phase | Balloting Date | Number of Systems | System Types | Installation Window |
---|---|---|---|---|
Phase 1 | March 2025 | 94,483 | 0.55 kW & 1.1 kW | March to July 2025 |
Phase 2 | July 2025 | 50,000 | 0.55 kW & 1.1 kW | August to December 2025 |
Types of Solar Systems Distributed
Category | Monthly Usage Limit | System Capacity | Includes |
---|---|---|---|
Basic System | Up to 100 units | 0.55 kW | Panel, Inverter, Wiring |
Extended System | 101–200 units | 1.1 kW | Panel, Inverter, Wiring, Battery |
Step-by-Step Next Process:
Step | Description |
---|---|
✅ Document Verification | Officials will contact you for CNIC, electricity bill, and site verification. |
🛠 Installation Visit | Technical team will assess your home for installation readiness. |
🔌 System Installation | The solar system will be installed within 30–90 days. |
🧾 Ownership Confirmation | You will sign ownership documents, and the system will be linked to your CNIC. |
Benefits of the Scheme
- 💰 Reduced Electricity Bills
- 🔋 Uninterrupted Power for Basic Needs
- 🌱 Environment-Friendly Energy
- 🏠 Improved Quality of Life in Rural Areas
Final Words
The CM Punjab Solar Panel Scheme is a revolutionary step toward energy self-sufficiency in Punjab. If you’ve been selected, congratulations! You’re part of a growing movement toward clean energy. If not, don’t lose hope — more chances are coming soon.
📌 Frequently Asked Questions (FAQs)
What is the CM Punjab Solar Panel Scheme 2025?
The CM Punjab Solar Panel Scheme 2025 is a government initiative that provides free solar systems to low-income households in Punjab that consume less than 200 electricity units per month, to reduce electricity bills and promote clean energy.
How long does installation take after selection?
Installation usually takes 30 to 90 days after successful verification and site inspection.
Is there any fee or cost involved?
No, the scheme is 100% free of cost for selected households. Be cautious of any individual or agent asking for money.